Anuragi, Ram Sajeewan

IndiaManBorn 19652013 – 2026Runner id 471765
Events
94
93 race dates
Best pace
9.330
km/h · 2026
Best finish
1st
of 11 · 2024
Distance raced
8,616
km · splits not double-counted

Pace over time

93 of 94 results · km/h

3.15.47.79.912.220132026

Pace over time: 93 races from 2013 to 2026, ranging from 3.75 to 11.57 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

1 result is not on this chart. They are counted in every statistic above and listed in full below — backyard ultras carry a lap count instead of a pace, which is the number that means something in that format.

Results

Results 51 to 94 of 94 for this runner, in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2023-07-3050km6:00:15 h8.32891/171
2023-08-1148h213.000 km4.4382/2
2023-11-2524h119.600 km4.9837/8
2023-12-2412h78.400 km6.5337/12
2024-02-1850km7:24:29 h6.74911/20
2024-03-0924h147.504 km6.14611/32
2024-03-1752km7:45:06 h6.70823/39
2024-03-2412h78.960 km6.5804/5
2024-07-2724h120.800 km5.03324/34
2024-08-1812h82.800 km6.9002/13
2024-09-2884km13:14:18 h6.3459/9
2024-10-0580km10:47:07 h7.4181/11
2024-11-1050km6:29:59 h7.69367/86
2024-12-0850km5:33:33 h8.99420/67
2024-12-2212h84.656 km7.0559/16
2025-02-0956km7:59:45 h7.0047/8
2025-03-0124h123.850 km5.16011/14
2025-03-0880km16:41:25 h4.7934/4
2025-03-3024h131.600 km5.48326/50
2025-04-2665km9:32:13 h6.81618/21
2025-05-1029h53.648 km8laps16/18
2025-05-31
Sundown Run 50kmIndia*Uttar Pradesh
50km5:39:32 h8.83622/36
2025-06-0750km7:28:35 h6.68816/35
2025-07-20
BMF UltraIndia
60km7:40:16 h7.82214/15
2025-08-0260km8:19:59 h7.20032/108
2025-08-1472h270.000 km3.7504/9
2025-11-0250km6:43:12 h7.44037/61
2025-12-2812h70.000 km5.8338/9
2026-01-2424h126.000 km5.25020/27
2026-02-0612h84.800 km7.06713/24
2026-03-0156km8:23:58 h6.66729/33
2026-03-0724h125.140 km5.2149/19
2026-03-22
Ooty UltraIndia
50km7:19:06 h6.83251/120
2026-04-0412h79.900 km6.65810/18
2026-04-1250km6:42:00 h7.46311/22
2026-04-2565km9:17:58 h6.99029/39
2026-05-3150km6:29:25 h7.70445/77
2026-06-0650km7:57:48 h6.27942/64
2026-06-2724h131.600 km5.4835/14
2026-07-10
The Trance Loops, 48hIndia*Banglore
48h185.135 km3.8573/5
2026-07-2650km5:21:33 h9.33043/319
2026-08-0175km11:08:00 h6.7374/14
2026-08-0862km7:44:44 h8.00520/192
2026-08-1372h290.400 km4.0334/9

Showing 51–94 of 94