Kumar, Sandeep

IndiaManBorn 19852015 – 2026Runner id 980770
Events
32
30 race dates
Best pace
12.140
km/h · 2024
Best finish
1st
of 251 · 2024
Distance raced
2,066
km · splits not double-counted

Pace over time

km/h · higher is faster

4.56.68.810.913.020152026

Pace over time: 32 races from 2015 to 2026, ranging from 5.09 to 12.44 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2015-11-0155km7:21:11 h7.4802/44
2016-02-2154km5:19:46 h10.1328/77
2017-06-04
Comrades Marathon - Up RunSouth AfricaSurti Runner
87km8:24:00 h10.3571209/13851
2017-10-0750km5:00:53 h9.9712/102
2017-12-0363.3km5:38:03 h11.2351/7
2018-06-10
Comrades Marathon - Down RunSouth AfricaSurti Runner/Unived At...
90km7:30:17 h11.992629/16484
2018-07-0850km4:16:45 h11.6851/101
2018-08-0412h61.060 km5.08872/79
2018-08-116h65.550 km10.9252/4
2018-09-08
IAU 100km WC, Sveti MartinCroatiaIAU BronzeNational Team India
100km9:13:13 h10.846154/221
2018-09-08
Cro100 - total (WC,WMA,open)CroatiaIAU BronzeNational Team India
100km9:13:13 h10.846167/275
2018-10-13
The Malnad Ultra 50KIndia*Surat
50km4:47:10 h10.4473/313
2018-10-2650km4:11:15 h11.94030/88
2018-11-03100km14:13:00 h7.0342/5
2019-02-1750km5:57:56 h8.3812/9
2019-07-1450km4:12:17 h11.8911/43
2019-11-0912h70.000 km5.83320/36
2019-11-16100km12:14:38 h8.1671/6
2019-11-23100km8:36:06 h11.6269/20
2020-02-2963km8:47:00 h7.17311/24
2023-12-0950km5:33:29 h8.9969/1289
2024-06-22
Mauritius by UTMB - Bel OmbreMauritiusRungineers
58.5km6:15:45 h9.3418/258
2024-08-24
Matterhorn UltraksSwitzerlandRungineers
49km7:46:25 h6.303111/705
2024-08-30101km15:30:17 h6.514162/1636
2024-11-0950km4:07:07 h12.1401/17
2024-11-23
The Malnad Ultra 50KIndia*Surat
50km5:06:19 h9.7941/251
2025-05-0345km4:43:57 h9.5091/2
2025-11-0260km5:57:28 h10.07111/105
2025-11-0250km4:42:33 h10.6183/61
2025-12-0648km5:57:56 h8.04655/2072
2026-05-3150km4:59:01 h10.0338/77
2026-06-276h45.200 km7.5331/1