Hernandez Ruiz, Javier

MexicoManBorn 19712016 – 2024Runner id 923071
Events
35
2016 – 2024
Best pace
8.119
km/h · 2016
Best finish
18th
of 123 · 2016
Distance raced
3,253
km · splits not double-counted

Pace over time

km/h · higher is faster

2.23.95.77.49.120162024

Pace over time: 35 races from 2016 to 2024, ranging from 2.69 to 8.65 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2016-04-2350km7:10:42 h6.96528/86
2016-06-04
Travesia en las Sierras 50kmMexico*Tulancingo
50km6:09:31 h8.11918/123
2016-07-16100km16:16:17 h6.14658/85
2016-09-1160km9:23:39 h6.38735/144
2016-12-1050km7:44:31 h6.4589/40
2017-01-2860km10:26:59 h5.74236/69
2017-03-0450km7:25:24 h6.736102/190
2017-04-2950km9:28:34 h5.27654/135
2017-05-1462km11:11:18 h5.54120/25
2017-09-3050km7:26:25 h6.72023/64
2017-10-21100km19:07:27 h5.229224/303
2017-12-0950km8:12:05 h6.09711/30
2018-01-27
Ultra Trail Oso Negro 100kMexico*Tulancingo Hidalgo
100km20:21:22 h4.91330/51
2018-03-2482km18:02:23 h4.54684/96
2018-04-2880km17:17:54 h4.62546/61
2018-10-27100km18:48:03 h5.319143/220
2018-11-17100km25:32:02 h3.91639/46
2018-12-0850km8:24:39 h5.94512/40
2019-01-26
Ultra Trail Oso Negro 100kMexico*Ciudad Estado
100km23:12:15 h4.31026/51
2019-04-1396km24:38:10 h3.89784/105
2019-06-1560km11:28:13 h5.23157/131
2019-06-29100km14:40:27 h6.81510/56
2019-07-0752km8:46:53 h5.92212/68
2019-08-28145km41:08:03 h3.5251006/1091
2019-09-06104km22:35:26 h4.60434/46
2019-10-26100km19:14:18 h5.198160/210
2020-01-25
Ultra Trail Oso Negro 100kMexico*Tulancingo Hidalgo
100km24:16:53 h4.11833/39
2021-05-2912h60.000 km5.00010/39
2021-09-25100mi26:42:28 h6.02621/56
2022-01-2980km16:08:34 h4.95620/34
2022-06-25160km29:33:32 h5.4131/5
2022-09-11330km5d 02:29:22 h2.694184/408
2023-05-20100mi24:26:20 h6.58513/60
2024-03-22100km20:13:31 h4.9449/52
2024-11-30100km31:43:05 h3.15319/23