Chi, Shun-Lung

Chinese TaipeiManBorn 19732016 – 2026Runner id 777996
Events
33
2016 – 2026
Best pace
9.174
km/h · 2016
Best finish
42nd
of 520 · 2016
Distance raced
2,124
km · splits not double-counted

Pace over time

km/h · higher is faster

4.05.57.18.610.120162026

Pace over time: 33 races from 2016 to 2026, ranging from 4.43 to 9.69 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2016-03-1260km6:32:24 h9.17442/520
2016-07-23
Tianxishui Ultra RunChinese Taipei
46.5km5:22:29 h8.65248/269
2016-11-2075km11:00:36 h6.81266/124
2017-01-01
Roaming 139 UltramarathonChinese Taipei
52.9km7:17:45 h7.25161/199
2017-01-3050.4km7:08:25 h7.0593/6
2017-07-1647km8:30:37 h5.52393/149
2017-08-05
Fenjei Ancient Trail 50Chinese Taipei
50km7:53:16 h6.33942/76
2018-03-0350km5:55:47 h8.43240/76
2018-04-29
Fencihu 100 Km Ultra RunChinese Taipei
100km14:46:56 h6.765113/143
2018-12-09100km13:54:24 h7.191167/189
2019-01-2053km8:49:12 h6.00961/130
2019-05-1150km7:20:18 h6.8145/43
2019-06-2350km7:03:30 h7.084167/442
2019-08-1756km9:37:47 h5.81533/51
2019-12-08100km13:54:58 h7.186311/336
2020-01-0550km5:52:56 h8.50054/76
2020-01-1853km8:10:30 h6.48331/100
2020-02-09
Fencihu 100 Km Ultra RunChinese Taipei
100km14:38:39 h6.829163/192
2020-06-1377km12:00:27 h6.4136/12
2020-11-14100km14:18:32 h6.989108/130
2020-12-19106km15:49:33 h6.698109/120
2021-01-24
Jinshui Camp Trail 53KmChinese Taipei
53km8:49:14 h6.00979/176
2022-10-1649km7:56:38 h6.16817/28
2023-05-27
Mei Shan 36 CurvesChinese Taipei
50km6:55:43 h7.21628/59
2023-10-1549km8:37:39 h5.68033/49
2024-01-2853km8:56:31 h5.92736/78
2024-02-0470.4km9:56:52 h7.07712/16
2024-03-0954km12:12:03 h4.42610/18
2024-06-0849.2km6:35:42 h7.4608/8
2024-12-0753km8:36:11 h6.16155/120
2024-12-22100km13:40:08 h7.316198/240
2025-12-0653km9:03:06 h5.85542/122
2026-02-0864km9:10:42 h6.97351/77