Nakano, Osamu

JapanManBorn 19742015 – 2026Runner id 660837
Events
29
2015 – 2026
Best pace
11.160
km/h · 2016
Best finish
4th
of 166 · 2017
Distance raced
2,008
km · splits not double-counted

Pace over time

km/h · higher is faster

6.17.69.010.512.020152026

Pace over time: 29 races from 2015 to 2026, ranging from 6.49 to 11.60 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2015-03-2947km4:37:45 h10.15360/462
2015-04-26
Okukumano 65 Km UltramarathonJapan*Osaka Pref.
65km7:45:16 h8.38237/108
2015-05-1652km5:03:13 h10.2903/110
2015-09-20
Tango 60 km UltramarathonJapanまなび
60km6:45:06 h8.887212/934
2016-03-2750km4:28:49 h11.16022/333
2016-04-24
Okukumano 65 Km UltramarathonJapan*Osaka Pref.
65km8:44:26 h7.43755/129
2016-05-15
Ishigaki Island Ultra MarathonJapan*Osaka Pref.
60km6:22:10 h9.4209/133
2016-06-1272km8:00:55 h8.98381/663
2016-06-26100km11:30:15 h8.6931176/2682
2016-09-1150km5:12:12 h9.60951/506
2016-10-16
River Shimanto 60kmJapanまなび
60km6:20:09 h9.47076/502
2017-04-23
Okukumano 65 Km UltramarathonJapan*Osaka Pref.
65km6:25:20 h10.12112/131
2017-05-27
Tojinbo 52 Km UltramarathonJapan*Osaka Pref.
52km4:45:44 h10.9194/166
2017-06-25100km11:48:22 h8.4701109/2311
2017-10-21
Iki 50 Km Ultra MarathonJapanまなび
50km5:26:44 h9.18249/226
2018-04-22
Okukumano 65 Km UltramarathonJapan*Osaka Pref.
65km7:28:07 h8.70323/144
2018-06-24100km12:22:16 h8.0831641/2402
2019-04-28
Okukumano 65 Km UltramarathonJapan*Osaka Pref.
65km6:43:42 h9.66116/162
2019-06-30100km11:26:51 h8.736975/2405
2023-04-23
Okukumano 65 Km UltramarathonJapan*Osaka Pref.
65km10:01:11 h6.48773/102
2024-06-30100km12:33:52 h7.9591302/1764
2025-04-2065km7:01:43 h9.24812/94
2025-05-3162km7:22:01 h8.41648/306
2025-06-29100km11:50:35 h8.444927/1936
2025-09-1460km8:02:20 h7.464274/619
2025-12-2150km5:38:20 h8.86750/210
2026-04-1965km7:11:21 h9.04113/140
2026-06-0663km7:11:09 h8.76733/418
2026-06-28100km11:29:53 h8.6971164/2632