Sundram, Munintaran

MalaysiaManBorn 19692013 – 2026Runner id 457910
Events
45
44 race dates
Best pace
9.507
km/h · 2015
Best finish
1st
of 120 · 2015
Distance raced
4,074
km · splits not double-counted

Pace over time

44 of 45 results · km/h

2.94.96.88.810.820132026

Pace over time: 44 races from 2013 to 2026, ranging from 3.44 to 10.21 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

1 result is not on this chart. They are counted in every statistic above and listed in full below — backyard ultras carry a lap count instead of a pace, which is the number that means something in that format.

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2013-09-14100km21:12:00 h4.71713/118
2014-02-15100km11:43:00 h8.5352/90
2014-08-16100km19:20:16 h5.1714/101
2014-09-06100km11:55:37 h8.3841/85
2015-03-07100km10:31:08 h9.5071/120
2015-05-0212h89.600 km7.4671/11
2015-08-29100km16:55:38 h5.9084/190
2016-03-19100km12:48:46 h7.8053/115
2016-04-16110km14:52:46 h7.39332/43
2017-01-14
Watergate 16hrMalaysia
16h70.000 km4.37540/422
2017-02-04100km13:02:13 h7.67116/119
2017-09-16100km17:03:58 h5.8609/249
2017-10-1550km5:30:00 h9.0911/12
2017-12-0255km6:25:12 h8.5672/97
2017-12-08100mi28:55:28 h5.5646/89
2018-01-06
Watergate 16hrMalaysia
16h55.000 km3.438138/396
2019-11-3080km10:23:48 h7.6954/63
2019-12-1484km14:40:46 h5.72216/268
2020-02-0184km9:34:32 h8.7722/83
2021-12-0412h47.200 km3.933118/125
2021-12-1884km13:49:00 h6.08012/151
2022-05-2879km11:16:16 h7.00979/220
2022-06-0524h149.310 km6.2211/22
2022-07-16100km19:48:35 h5.04832/230
2022-09-0967.3km13:07:05 h5.13021/352
2022-09-17109km29:49:36 h3.65488/223
2022-10-08105km30:14:56 h3.47160/143
2023-03-0485km15:56:42 h5.33180/348
2023-07-2980km13:53:12 h5.76140/85
2023-11-25100km18:24:11 h5.43422/57
2024-03-02106km26:02:45 h4.07044/145
2024-04-0770km14:25:12 h4.85428/139
2024-05-04100km22:16:28 h4.48938/102
2024-07-27110km20:45:27 h5.29913/196
2024-08-10
AKHA TrailThailand
80km16:06:51 h4.9655/18
2024-11-30100km26:39:15 h3.75226/33
2024-12-20103km22:23:01 h4.60216/57
2025-01-1170km10:27:07 h6.69747/278
2025-02-0821h67.060 km10laps16/21
2025-02-1450mi19:01:53 h4.22832/59
2025-03-0875km12:31:30 h5.98849/169
2025-04-0575km17:26:27 h4.30043/78
2025-05-0280km20:55:59 h3.82226/42
2025-08-1653km6:46:36 h7.82122/575
2026-05-01160km38:33:05 h4.15035/80