Oku, Koji

JapanManBorn 19481998 – 2024Runner id 377198
Events
30
1998 – 2024
Best pace
7.651
km/h · 2013
Best finish
1st
of 8 · 2003
Distance raced
3,717
km · splits not double-counted

Pace over time

km/h · higher is faster

3.25.06.78.510.319982024

Pace over time: 30 races from 1998 to 2024, ranging from 3.67 to 9.77 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
1998-05-03140km22:06:15 h6.33421/60
2001-07-21
Yashagaike Legend Maranic 132 KmJapan*Ashiya, Hyogo
132km20:34:55 h6.413171/191
2002-05-02250km45:55:57 h5.44360/108
2003-12-28277km2d 08:08:00 h4.9351/8
2004-05-02250km44:28:58 h5.62060/190
2005-05-02250km45:30:47 h5.493105/173
2005-10-0250km7:34:10 h6.60622/23
2006-05-02250km46:44:38 h5.348125/164
2006-10-08
Adatara Ultra RunJapan*Ashiya, Hyogo Pref.
53km8:35:46 h6.16618/27
2012-05-20100km14:41:38 h6.806306/326
2013-04-2170km9:08:56 h7.651119/209
2013-06-01
Tokyo Shibamata 60 kmJapan*Hyogo Pref.
60km8:35:12 h6.988686/767
2013-09-2966km10:50:05 h6.092359/385
2014-04-27
Okukumano 65 Km UltramarathonJapan*Hyogo Pref.
65km9:02:35 h7.18866/113
2015-04-26
Okukumano 88 Km UltramarathonJapan*Hyogo Pref.
88km13:28:22 h6.5326/6
2017-05-04173km32:47:33 h5.276109/126
2017-12-0280km12:42:00 h6.29923/29
2018-02-20
Philippinenlauf Etappe 1Philippines*Kyoto
50km9:25:00 h5.3108/13
2018-02-23
Philippinenlauf Etappe 3Philippines*Kyoto
46km9:03:00 h5.0839/14
2018-02-24
Philippinenlauf Etappe 4Philippines*Kyoto
48km9:02:00 h5.3148/10
2018-02-26
Philippinenlauf Etappe 5Philippines*Kyoto
45km7:40:00 h5.8705/11
2018-02-27
Philippinenlauf Etappe 6Philippines*Kyoto
45km9:10:00 h4.9097/10
2018-05-04173km33:47:47 h5.119104/117
2019-03-03250km2d 20:02:27 h3.67483/88
2019-12-0780km12:12:00 h6.55715/20
2021-04-1152km9:00:00 h5.77824/24
2021-08-15250km47:25:55 h5.27136/54
2022-04-0952km7:39:00 h6.79724/29
2022-09-09220km2d 06:39:36 h4.02515/17
2024-04-0652km8:13:00 h6.32947/47