Kimura, Tomonori

JapanManBorn 19752011 – 2025Runner id 322468
Events
28
2011 – 2025
Best pace
11.953
km/h · 2016
Best finish
2nd
of 173 · 2017
Distance raced
2,120
km · splits not double-counted

Pace over time

km/h · higher is faster

5.47.39.111.012.820112025

Pace over time: 28 races from 2011 to 2025, ranging from 5.93 to 12.33 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2011-06-26
Lake Saroma 100 Km UltramarathonJapanIAU Bronze*Hokkaido
100km10:50:29 h9.224587/2170
2011-09-2450km8:06:13 h6.17027/61
2012-06-24100km11:12:05 h8.927796/2394
2012-09-2350km8:03:49 h6.20114/59
2013-06-30100km9:21:34 h10.684170/2123
2013-09-2251.4km6:20:25 h8.1075/55
2014-07-20110km12:57:45 h8.4864/60
2014-09-21
Hokkaido Outdoor Festival 50 Km RunJapanカローラ札幌
51.4km6:43:52 h7.6368/56
2015-06-28
Lake Saroma 100 Km UltramarathonJapanIAU Bronzeカローラ札幌
100km9:37:28 h10.390346/2721
2015-09-27
Hokkaido Outdoor Festival 60 Km RunJapanカローラ札幌
60km8:38:58 h6.9372/3
2016-06-26
Lake Saroma 100 Km UltramarathonJapanカローラ札幌
100km8:21:59 h11.95383/2682
2016-07-2480km9:11:11 h8.7092/91
2016-09-25
Hokkaido Outdoor Festival 60 Km RunJapanカローラ札幌
60km8:01:53 h7.4711/46
2016-10-0971.5km11:14:00 h6.365129/1923
2017-06-25
Lake Saroma 100 Km UltramarathonJapanカローラ札幌
100km8:30:48 h11.74678/2311
2017-07-2380km8:34:03 h9.3382/173
2017-10-0871.5km12:03:28 h5.930175/1729
2018-07-2280km8:00:19 h9.9934/185
2018-08-1955km4:58:27 h11.0577/129
2018-09-23
Hokkaido Outdoor Festival 60 Km RunJapanカローラ札幌
66km8:28:46 h7.7848/97
2018-11-24
FTGR Summits 50Hong Kong
50km6:22:31 h7.8436/56
2019-08-1855km5:02:33 h10.90711/134
2019-09-22
Hokkaido Outdoor Festival 60 Km RunJapanカローラ札幌
63km10:03:37 h6.26228/101
2022-07-2460km9:07:04 h6.58113/36
2022-08-2155km5:24:17 h10.1768/60
2023-06-25100km10:30:51 h9.511425/1930
2024-06-30100km9:51:17 h10.147261/1764
2025-06-29100km11:20:05 h8.822712/1936