Shima, Toshitsugu

JapanManBorn 19612012 – 2022Runner id 288798
Events
26
2012 – 2022
Best pace
10.887
km/h · 2015
Best finish
20th
of 818 · 2015
Distance raced
2,869
km · splits not double-counted

Pace over time

km/h · higher is faster

2.14.97.710.513.320122022

Pace over time: 26 races from 2012 to 2022, ranging from 2.89 to 12.53 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2012-04-22
Fuji 5 Lakes 72 km ChallengeJapanKansai Electric Power ...
72km7:58:05 h9.036115/727
2012-05-2071km8:14:30 h8.61539/227
2012-06-24100km11:24:21 h8.767900/2394
2013-01-13
Miyako 100 Km UltramarathonJapan*Kyoto Pref.
100km12:35:52 h7.938170/370
2013-04-2172km8:25:17 h8.550115/732
2013-05-19
Yatsugatake Nobeyama 71 kmJapan*Kyoto Pref.
71km9:45:56 h7.270151/236
2013-06-09100km12:42:34 h7.868472/873
2014-04-20
Fuji 5 Lakes 72 km ChallengeJapanしまやんず
72km8:33:35 h8.411147/845
2014-05-18
Yatsugatake Nobeyama 71 kmJapan*Kyoto Pref.
71km8:59:48 h7.89265/227
2014-06-08100km12:31:53 h7.980488/977
2015-01-11
Miyako 100 Km UltramarathonJapan*Kyoto Pref.
100km9:37:50 h10.38435/510
2015-04-19
Fuji 5 Lakes 71 km ChallengeJapanしまやんず
71km6:31:18 h10.88720/818
2015-05-17
Yatsugatake Nobeyama 71 kmJapan*Kyoto Pref.
71km6:44:41 h10.52713/174
2015-08-02
OSJ Yamanaka Onsen Trail RunJapanしまやんず
74km13:56:31 h5.30838/107
2016-01-17
Miyako 100 Km UltramarathonJapan*Kyoto Pref.
100km11:33:14 h8.65598/427
2017-01-15
Miyako 100 Km UltramarathonJapanしまやんず
100km12:06:54 h8.254147/393
2017-07-15200km35:59:30 h5.55734/76
2017-08-2770km11:33:38 h6.055124/133
2017-11-0445km5:11:32 h8.66727/67
2017-12-1768km9:31:35 h7.138136/463
2018-02-10
OSJ Jungle Trail 50K AmamiJapan*Kyoto Pref.
50km6:33:40 h7.62145/97
2019-03-24
Ibaraki 100k Ultra MarathonJapan*Kyoto Pref.
100km13:36:47 h7.346456/523
2020-10-24146km23:08:37 h6.308117/204
2021-10-09155km26:36:00 h5.82746/58
2021-10-16120km18:44:00 h6.40635/84
2022-04-28570km8d 05:27:00 h2.88721/32