Sako, Naoya

JapanManBorn 19812010 – 2026Runner id 274038
Events
34
2010 – 2026
Best pace
9.651
km/h · 2011
Best finish
34th
of 1,154 · 2015
Distance raced
3,794
km · splits not double-counted

Pace over time

km/h · higher is faster

1.53.75.98.110.320102026

Pace over time: 34 races from 2010 to 2026, ranging from 2.14 to 9.65 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2010-05-1653km7:39:58 h6.91431/103
2010-11-14
OSJ Hyonosen Mountains Trail RaceJapan*Tokushima Pref.
80km15:58:53 h5.00680/147
2011-05-14
Tsurugi Naka Trail Running RaceJapan*Tokushima Pref.
53km5:29:29 h9.65118/160
2011-10-0971.5km13:39:50 h5.233401/1725
2012-05-18
Ultra-Trail Mount Fuji (UTMF)Japan*Tokushima Pref.
156km43:06:21 h3.619399/611
2012-07-15
OSJ Ontake 100km Ultra TrailJapan*Tokushima Pref.
100km14:34:39 h6.860370/738
2012-10-28
OSJ Hyonosen Mountains Trail RaceJapan*Tokushima Pref.
71km10:20:33 h6.86523/186
2012-11-04
Shinshu-Togakushi Trail Run RaceJapanかう぀HうA
45km6:41:18 h6.72848/303
2013-04-26
Ultra-Trail Mount Fuji (UTMF)Japan*Tokushima Pref.
100mi31:32:02 h5.104128/724
2013-08-30168km35:40:28 h4.709384/1686
2013-10-20
OSJ Hyonosen Mountains Trail RaceJapan*Tokushima Pref.
71km10:38:35 h6.67144/376
2014-08-10415km8d 02:04:00 h2.13814/15
2014-09-20120km20:50:42 h5.75733/385
2015-03-15
Izu Trail JourneyJapanNichia
72km8:36:27 h8.36534/1154
2015-05-17
Gasando Trail running raceJapan*Anan, Tokushima Pref.
73km7:37:22 h9.57714/284
2015-05-30
Mt. Hiei Int. 50 Km Trail RunJapan*Tokushima Pref.
50km7:19:21 h6.82822/438
2015-07-0480km10:23:08 h7.70324/468
2016-04-24
Okumikawa Power TrailJapanNICHIA
70km8:44:48 h8.00317/475
2016-05-2958km9:18:50 h6.22720/57
2016-08-07415km6d 15:00:00 h2.61011/25
2017-05-2180km9:40:00 h8.2763/38
2018-08-12415km6d 09:56:00 h2.6965/27
2019-02-2345.6km6:12:07 h7.3535/11
2019-03-2364km10:24:07 h6.15318/27
2019-09-0724h85.500 km3.5637/18
2020-02-2245.6km6:20:15 h7.1954/8
2022-10-07169km40:53:13 h4.13357/175
2024-06-07103km28:21:38 h3.6321/20
2025-01-1949.6km6:55:26 h7.1645/23
2025-02-2245km6:22:47 h7.0549/18
2025-09-20110km17:01:15 h6.46320/331
2026-01-1849.6km6:53:41 h7.1943/15
2026-02-2845km6:36:18 h6.81311/16
2026-06-20105km17:19:15 h6.06264/714