Watanabe, Satoshi

JapanManBorn 19702000 – 2025Runner id 250416
Events
29
28 race dates
Best pace
9.429
km/h · 2022
Best finish
226th
of 940 · 2022
Distance raced
2,757
km · splits not double-counted

Pace over time

km/h · higher is faster

3.65.57.49.311.220002025

Pace over time: 29 races from 2000 to 2025, ranging from 4.09 to 10.66 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2000-10-15
River Shimanto 100kmJapan*Kagawa Pref.
100km13:45:54 h7.265757/843
2003-10-19100km13:51:57 h7.2121121/1194
2004-06-20
Nichinan Orochi 100 Km MarathonJapan*Kagawa Pref.
100km13:10:05 h7.594193/297
2004-10-17100km13:32:49 h7.382947/1187
2005-10-16100km13:50:11 h7.227981/1083
2006-10-15100km13:52:39 h7.206995/1043
2007-10-14
River Shimanto 100kmJapan危険事業推進会
100km13:55:27 h7.1821076/1125
2007-10-1471.5km17:28:27 h4.092845/1540
2008-10-19100km13:25:54 h7.445746/1011
2009-05-17100km13:21:20 h7.488470/823
2009-10-18100km12:37:13 h7.924634/1166
2011-10-16
River Shimanto 100kmJapan*Kagawa Pref.
100km11:23:09 h8.783271/1071
2011-12-03
Kepler Challenge Mountain RunNew Zealand*Shiki, Saitama
60km9:30:36 h6.309361/456
2012-02-18
Hong Kong 100 Ultra Trail RaceHong Kong*Shiki, Saitama
100km23:02:17 h4.341382/508
2012-10-21
River Shimanto 100kmJapan*Kagawa Pref.
100km13:40:35 h7.312886/1071
2013-05-03140km23:04:26 h6.067185/269
2013-10-0570km11:50:30 h5.91122/41
2014-10-19100km11:53:12 h8.413442/1246
2015-10-18
River Shimanto 100kmJapan*Kagawa Pref.
100km11:39:21 h8.579369/1246
2016-10-16100km12:54:23 h7.748751/1365
2017-05-0370km8:25:16 h8.312539/571
2017-10-15100km11:45:53 h8.500482/1408
2018-10-21100km12:37:59 h7.916693/1354
2019-10-20100km13:12:32 h7.571806/1282
2022-09-2945km4:46:21 h9.429226/940
2023-10-15100km11:35:54 h8.622320/1078
2024-10-13100km12:55:34 h7.736480/805
2024-10-20100km11:38:28 h8.590411/1220
2025-10-19100km11:41:01 h8.559318/1008