Tenzou, Toyohiko

JapanManBorn 19582008 – 2026Runner id 223223
Events
26
2008 – 2026
Best pace
9.407
km/h · 2012
Best finish
549th
of 2,394 · 2012
Distance raced
2,370
km · splits not double-counted

Pace over time

km/h · higher is faster

6.27.79.210.712.220082026

Pace over time: 26 races from 2008 to 2026, ranging from 6.59 to 11.78 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2008-10-19
River Shimanto 100kmJapanキリンビール
100km11:48:15 h8.472334/1011
2009-06-28
Lake Saroma 100 Km UltramarathonJapan*Yamagata Pref.
100km12:13:31 h8.1801453/2284
2010-06-27
Lake Saroma 100 Km UltramarathonJapanIAU Bronze*Cochin Pref.
100km11:34:18 h8.642648/1606
2011-06-26
Lake Saroma 100 Km UltramarathonJapanIAU Bronze*Kochi Pref.
100km12:03:32 h8.2931179/2170
2011-10-16
River Shimanto 100kmJapan*Kochi Pref.
100km11:49:44 h8.454370/1071
2012-06-24100km10:37:49 h9.407549/2394
2012-10-21
River Shimanto 100kmJapan*Kochi Pref.
100km11:46:35 h8.492344/1071
2013-06-09100km12:18:51 h8.121397/873
2013-09-29100km12:20:41 h8.101198/634
2014-06-29
Lake Saroma 100 Km UltramarathonJapan土佐の高知
100km12:30:29 h7.9951166/1829
2014-10-19
River Shimanto 100kmJapan高知県産業振興
100km11:39:05 h8.583375/1246
2015-06-28
Lake Saroma 100 Km UltramarathonJapanIAU Bronze元リクキリン
100km11:58:37 h8.3491565/2721
2015-09-20
Tango 100 km UltramarathonJapanIAU Bronze元リク麒麟
100km12:40:57 h7.885738/1613
2016-06-26
Lake Saroma 100 Km UltramarathonJapan元リク麒麟
100km12:26:04 h8.0421901/2682
2017-06-25
Lake Saroma 100 Km UltramarathonJapan元リク麒麟
100km11:46:01 h8.4981085/2311
2017-10-15100km11:37:41 h8.600434/1408
2018-06-24100km11:20:00 h8.824950/2402
2018-10-21100km12:34:55 h7.948680/1354
2019-06-30100km12:46:26 h7.8282030/2405
2022-06-12100km12:45:51 h7.834426/750
2022-12-11100km13:42:58 h7.29127/35
2024-06-3050km7:13:50 h6.915252/368
2024-10-2060km7:28:52 h8.020182/537
2025-06-2950km6:59:27 h7.152204/377
2025-10-1960km9:06:13 h6.591312/410
2026-06-2850km5:38:31 h8.862107/452