Umetsu, Hiroaki

JapanManBorn 19652009 – 2026Runner id 221921
Events
29
2009 – 2026
Best pace
8.442
km/h · 2011
Best finish
128th
of 656 · 2011
Distance raced
2,311
km · splits not double-counted

Pace over time

km/h · higher is faster

5.06.17.28.39.420092026

Pace over time: 29 races from 2009 to 2026, ranging from 5.31 to 9.14 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2009-10-04
Madarao Forest Trails 50kmJapanアクトス磐田
50km6:17:27 h7.94871/338
2010-10-03
Madarao Forest Trails 50kmJapanアクトス磐田
50km6:49:09 h7.332109/364
2011-04-3072km8:31:45 h8.442128/656
2011-10-02
Madarao Forest Trails 50kmJapanアクトス磐田
50km6:49:56 h7.318125/369
2012-04-22100km13:16:21 h7.534731/1079
2012-10-07
Madarao Forest Trails 50kmJapanアラジンtr
50km6:28:53 h7.71498/405
2013-03-10
Izu Trail JourneyJapan*Shizuoka Pref.
72km11:05:07 h6.495416/1148
2013-04-21
Fuji 5 Lakes 112 km ChallengeJapanアクトス磐田
112km14:28:38 h7.736287/297
2014-11-09
Kanna Mountain RunJapanアラジンtr
50km7:59:18 h6.25927/81
2015-03-15
Izu Trail JourneyJapanアラジンtr
72km12:01:56 h5.984536/1154
2015-04-12
Okumikawa Power TrailJapan*Shizuoka Pref.
63km11:51:43 h5.311209/233
2015-05-17
Yatsugatake Nobeyama 100 kmJapanアラジンtr
100km12:46:01 h7.833639/1460
2016-04-24
Okumikawa Power TrailJapanアラジンTR
70km10:59:35 h6.368178/475
2016-05-22
Yatsugatake Nobeyama 100 kmJapanアラジンtr
100km12:42:13 h7.872579/1438
2016-09-18
Tango 100 km UltramarathonJapanアラジンtr部
100km13:07:11 h7.622730/1321
2016-11-2050km6:45:19 h7.40244/65
2017-04-23
Okumikawa Power TrailJapanアラジンtr
70km11:48:12 h5.931201/411
2017-05-21
Yatsugatake Nobeyama 100 kmJapanアラジンtr
100km13:26:02 h7.444686/1119
2018-04-22
Okumikawa Power TrailJapanアラジンTR
70km12:39:43 h5.528205/264
2018-05-20
Yatsugatake Nobeyama 100 kmJapanアラジンtr
100km13:00:34 h7.687760/1588
2019-04-0770km12:00:52 h5.826277/568
2019-05-19100km13:07:51 h7.616858/1594
2022-04-1070km12:33:40 h5.573197/339
2022-05-22100km13:49:58 h7.229874/1113
2023-05-21100km13:51:32 h7.216700/808
2024-05-19100km13:48:00 h7.246944/1159
2025-04-1370km10:23:52 h6.732118/273
2025-05-18100km13:52:03 h7.2111081/1214
2026-05-17100km14:02:07 h7.1251351/1354