Nobukuni, Atsuko

JapanWomanBorn 19622009 – 2026Runner id 181945
Events
35
2009 – 2026
Best pace
7.934
km/h · 2026
Best finish
3rd
of 22 · 2025
Distance raced
4,056
km · splits not double-counted

Pace over time

km/h · higher is faster

3.35.37.39.411.420092026

Pace over time: 35 races from 2009 to 2026, ranging from 3.83 to 10.83 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2009-07-19
OSJ Ontake 100km Ultra TrailJapan*Fukuoka Pref.
100km16:45:36 h5.967247/389
2014-05-04173km27:26:23 h6.30532/98
2014-07-2063km10:56:55 h5.754156/324
2015-05-04173km26:28:38 h6.53441/160
2015-07-2163km12:25:35 h5.070194/292
2015-11-20276km2d 05:39:02 h5.14435/50
2016-05-04129km19:37:35 h6.57387/198
2016-07-2467.5km11:34:05 h5.835151/309
2017-05-04173km27:36:23 h6.26739/126
2017-05-13
Aso Round TrailJapanスクバロ☆
108.7km25:15:34 h4.30393/227
2017-07-23
Kirishima Ebino-kougen Extreme TrailJapanスク バロ ☆
67.5km11:23:21 h5.927133/362
2018-05-04173km28:01:07 h6.17422/117
2018-05-12
Aso Round TrailJapanスクバロ☆
108.7km25:03:25 h4.338209/438
2018-07-2167.5km11:39:22 h5.791157/320
2019-05-04173km28:03:00 h6.16824/112
2019-05-11
Aso Round TrailJapanスクバロ☆
121km27:10:18 h4.453174/407
2021-03-1462km11:49:23 h5.244142/208
2021-07-2560km11:08:42 h5.384149/265
2022-05-03173km29:23:14 h5.88726/100
2022-05-29
Mizukami Mountain PartyJapan*Fukuoka Pref.
64km11:26:58 h5.59072/166
2022-07-2460km11:31:23 h5.207167/319
2022-08-1168.4km14:49:05 h4.61656/60
2023-05-03173km28:24:13 h6.09113/68
2023-08-1164km14:51:29 h4.30772/72
2024-03-23109km28:26:19 h3.833312/497
2024-05-04173km28:03:59 h6.16416/58
2024-11-16
Kumagawa Revival TrailJapan*Fukuoka Pref.
167km39:46:22 h4.199122/143
2025-02-0246km9:06:00 h5.05530/55
2025-07-2066km11:19:18 h5.830122/292
2025-08-1050km11:35:04 h4.316114/184
2025-09-13100km16:15:49 h6.14916/33
2025-11-22276km2d 05:02:00 h5.2043/22
2025-12-2050km9:30:55 h5.255104/128
2026-05-04173km28:12:51 h6.13224/79
2026-06-1484.39km10:38:10 h7.934173/384