Hasegawa, Mai

JapanWomanBorn 19782004 – 2026Runner id 181547
Events
31
2004 – 2026
Best pace
9.303
km/h · 2009
Best finish
4th
of 37 · 2025
Distance raced
2,722
km · splits not double-counted

Pace over time

km/h · higher is faster

2.94.66.48.19.820042026

Pace over time: 31 races from 2004 to 2026, ranging from 3.41 to 9.30 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2004-10-1071.5km17:49:19 h4.012386/968
2005-10-0971.5km19:22:04 h3.692646/1111
2007-10-1471.5km15:13:16 h4.697524/1540
2008-10-05
Madarao Forest Trails 50kmJapan三菱重工食品機械
50km6:48:36 h7.342115/354
2009-02-08
OSJ Jungle Trail 50K AmamiJapan*Aichi Pref.
50km5:22:29 h9.30333/173
2009-04-12
OSJ Okukuji Trail 50kJapan*Aichi Pref.
50km10:50:57 h4.60964/172
2009-07-05
OSJ Shiga Kogen Trail 50KJapan三菱重工食品
50km9:58:24 h5.013220/335
2010-04-11
OSJ Okukuji Trail 50kJapan三菱重工食品
50km11:23:10 h4.391104/271
2010-07-04
OSJ Shiga Kogen Trail 50KJapan三菱重工食品
50km8:22:48 h5.96758/182
2010-07-18
OSJ Ontake 100km Ultra TrailJapan*Aichi Pref.
100km13:52:57 h7.20380/476
2010-09-19110km17:28:42 h6.29490/384
2011-07-17
OSJ Ontake 100km Ultra TrailJapan*Aichi Pref.
100km15:33:51 h6.425201/426
2011-09-24110km19:27:22 h5.654210/430
2011-10-30
Shinshu-Togakushi Trail Run RaceJapan三菱重工食品
45km7:02:53 h6.38570/226
2013-03-10
Izu Trail JourneyJapan*Aichi Pref.
72km12:04:19 h5.964659/1148
2019-03-23112km18:10:00 h6.16562/141
2019-09-0150km12:19:31 h4.05797/233
2022-05-21
Mt. Hiei Int. 50 Km Trail RunJapan*Hyogo Pref.
50km8:15:07 h6.059109/573
2022-08-0690km20:46:30 h4.3326/18
2022-10-28112km19:40:00 h5.69543/116
2022-11-05
OSJ Kami 100Japan*Hyogo Pref.
100km24:30:32 h4.080140/151
2023-05-2860km7:20:35 h8.17131/171
2024-03-23109km27:37:48 h3.945285/497
2024-05-18160km34:41:30 h4.61216/17
2024-11-2266km18:27:29 h3.5767/10
2025-01-18100km15:33:14 h6.4297/15
2025-02-2272km12:47:21 h5.6304/37
2025-10-10169km47:29:09 h3.559163/244
2025-12-19100km22:21:38 h4.472132/307
2026-03-28160km26:21:18 h6.07146/144
2026-05-22160km46:52:30 h3.41387/110