Suzuki, Shoichi

JapanManBorn 19862009 – 2026Runner id 177301
Events
29
2009 – 2026
Best pace
11.299
km/h · 2019
Best finish
49th
of 1,510 · 2019
Distance raced
2,882
km · splits not double-counted

Pace over time

km/h · higher is faster

6.07.48.810.311.720092026

Pace over time: 29 races from 2009 to 2026, ranging from 6.39 to 11.30 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2009-09-27100km11:39:33 h8.577277/725
2010-09-26
Akita Nairiku 100km MarathonJapan*Miyagi Pref.
100km10:43:30 h9.324131/740
2012-10-06
Echigo Kubikino 100km UltramarathonJapan*Niigata, Niigata Pref.
100km10:56:18 h9.142219/1132
2013-09-22100km9:25:01 h10.61946/668
2014-10-12100km10:23:37 h9.621163/1325
2017-06-04
Ultramarathon OkumusashiJapan謙信走会
78km6:58:39 h11.17960/1442
2017-09-24100km9:11:29 h10.88018/531
2018-04-22
Fuji 5 Lakes 118 km ChallengeJapan謙信走会
118km12:52:52 h9.16194/487
2018-06-03
Ultramarathon OkumusashiJapanちーむ氷瀑
78km7:25:18 h10.51071/1396
2019-04-21118km11:23:51 h10.35331/544
2019-06-02
Ultramarathon OkumusashiJapanち~む氷瀑
78km6:54:11 h11.29949/1510
2019-09-22
Akita Nairiku 100km MarathonJapan*Shizuoka Pref.
100km8:53:22 h11.24926/593
2020-08-22
Toda Aya Lake Ultra MarathonJapanち~む氷瀑
63.7km6:10:21 h10.32016/115
2022-06-0578km7:17:09 h10.70671/853
2022-07-038h73.500 km9.18823/224
2022-09-25100km9:18:29 h10.74326/360
2023-04-16
Fuji 5 Lakes 118 km ChallengeJapanち~む氷瀑
118km13:11:23 h8.946104/364
2023-06-0478km8:14:44 h9.460112/814
2023-09-24100km9:57:47 h10.03758/497
2023-11-11100km12:26:42 h8.03549/168
2024-04-21118km12:13:16 h9.65537/418
2024-05-19100km11:32:43 h8.662185/1159
2024-06-1548km6:28:58 h7.404103/502
2024-09-22100km10:53:57 h9.17564/322
2025-04-20120km12:04:53 h9.93364/492
2025-05-18100km11:04:16 h9.033144/1214
2025-09-28100km10:37:28 h9.41278/337
2025-10-11215km33:37:57 h6.3936/54
2026-05-17100km11:56:00 h8.380285/1354