Mohd. Salehuddin, Abdul Rasyid

MalaysiaManBorn 19922021 – 2026Runner id 1753305
Events
31
28 race dates
Best pace
10.737
km/h · 2023
Best finish
1st
of 67 · 2022
Distance raced
3,106
km · splits not double-counted

Pace over time

29 of 31 results · km/h

2.85.07.19.211.320212026

Pace over time: 29 races from 2021 to 2026, ranging from 3.42 to 10.74 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

2 results are not on this chart. They are counted in every statistic above and listed in full below — backyard ultras carry a lap count instead of a pace, which is the number that means something in that format.

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2021-12-1884km12:52:50 h6.5216/151
2022-02-2012h88.000 km7.3333/101
2022-06-25100km15:38:57 h6.3901/67
2022-08-2712h110.000 km9.1672/84
2022-09-17109km22:47:18 h4.78327/223
2022-10-08105km30:41:46 h3.42168/143
2022-11-19100km16:02:48 h6.2328/191
2023-01-0812h79.500 km6.6254/76
2023-02-1818h120.708 km18laps1/10
2023-03-17200km37:50:23 h5.28515/19
2023-05-1450km4:39:25 h10.7379/55
2023-06-03
Borneo 100 MilerMalaysia
100miles36:08:28 h4.45311/107
2023-07-02
Bukit Kiara XMalaysia
52km8:16:07 h6.2895/32
2023-07-08116km31:23:05 h3.69619/27
2023-07-2980km9:36:21 h8.3284/85
2023-08-18100mi39:58:42 h4.0264/11
2023-10-07105km23:43:08 h4.4273/33
2023-11-03100km16:55:10 h5.91017/209
2024-07-2012h63.000 km5.2506/15
2024-07-2012h69.300 km2/7
2024-08-24
Pahang Eco 100kmMalaysia
100km26:10:41 h3.82010/61
2024-08-2412h64.000 km5.33324/34
2024-09-2866km18:32:25 h3.5602/14
2025-01-17162km26:06:48 h6.2048/40
2025-02-0824h126.000 km5.2502/25
2025-05-09
BTR UltraIndonesia
100km28:43:58 h3.48039/86
2025-07-19100km21:34:33 h4.63522/141
2025-08-02
Pahang Eco 75kmMalaysia
75km17:22:12 h4.31810/47
2026-05-01100km13:37:34 h7.3396/287
2026-06-20
Trail des GombakMalaysia
100km24:32:24 h4.07516/48
2026-07-1860km8:37:26 h6.95712/600