Sano, Hirotaka

JapanManBorn 19692008 – 2026Runner id 161544
Events
37
2008 – 2026
Best pace
12.005
km/h · 2022
Best finish
11th
of 532 · 2010
Distance raced
3,538
km · splits not double-counted

Pace over time

km/h · higher is faster

5.17.49.712.014.320082026

Pace over time: 37 races from 2008 to 2026, ranging from 5.74 to 13.69 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2008-06-22100km10:06:39 h9.89040/273
2009-04-2672km6:22:05 h11.30619/455
2009-05-17100km11:21:08 h8.809126/823
2009-08-0275km6:42:44 h11.17445/940
2009-10-1171.5km11:50:02 h6.042212/1727
2010-04-2572km6:14:58 h11.52111/532
2010-05-16
Yatsugatake Nobeyama 100 kmJapan商工中金
100km9:43:40 h10.28042/1097
2010-08-0177km7:05:22 h10.86143/921
2010-09-17143km18:29:58 h7.73010/112
2010-10-1071.5km11:21:43 h6.293122/1622
2011-07-108h48.690 km6.086169/262
2011-09-18143km19:07:45 h7.47513/122
2013-09-15142km20:22:07 h6.97237/170
2014-09-14142km21:11:27 h6.70158/196
2015-05-03140km23:41:46 h5.908109/129
2015-07-1824h137.700 km5.7389/19
2015-09-126h61.600 km10.2673/11
2016-05-03140km20:54:14 h6.69747/250
2017-04-08
Toda Saiko 70 kmJapan*Saitama Pref.
70km6:19:01 h11.08162/620
2017-06-04
Ultramarathon OkumusashiJapan*Saitama Pref.
78km7:50:07 h9.955167/1442
2017-07-028h74.658 km9.33216/82
2018-06-03
Ultramarathon OkumusashiJapan*Saitama Pref.
78km7:34:10 h10.30585/1396
2018-06-30
8-Hour Endurance Race TokorozawaJapan*Saitama Pref.
8h68.600 km8.57535/234
2019-06-02
Ultramarathon OkumusashiJapan*Saitama Pref.
78km8:07:35 h9.598241/1510
2021-10-0980km10:11:00 h7.8561/11
2022-04-09150km21:28:00 h6.9882/13
2022-05-0370km5:49:52 h12.00523/281
2023-05-03
Mukogawa Yurikamome Ultra MarathonJapan多摩川サブ3会
70km5:55:35 h11.81218/276
2024-04-06150km21:07:00 h7.1036/8
2024-05-0370km6:48:04 h10.29275/291
2024-10-19120km17:31:00 h6.8512/16
2025-04-05150km19:33:00 h7.6732/6
2025-05-0370km6:15:15 h11.19351/304
2025-06-216h50.600 km8.4335/7
2026-04-04150km22:16:00 h6.7375/12
2026-05-0370km6:28:44 h10.80459/296
2026-06-206h52.800 km8.8006/16