Maeyama, Hayato

JapanManBorn 19612003 – 2026Runner id 118844
Events
30
2003 – 2026
Best pace
12.991
km/h · 2009
Best finish
4th
of 152 · 2009
Distance raced
3,429
km · splits not double-counted

Pace over time

km/h · higher is faster

3.86.69.412.215.020032026

Pace over time: 30 races from 2003 to 2026, ranging from 4.59 to 14.19 kilometres per hour, where higher is faster. A second, age-graded series is drawn above it; the gap between the two is the age credit.

  • Actual pace
  • Age-graded pace

Results

Every result for this runner in date order. Splits of a race are indented and are not counted again in the distance total.
DateEventDistanceResultPace km/hPlacing
2003-10-19
River Shimanto 100kmJapanペガサス走友会
100km8:55:08 h11.21237/1194
2005-08-07
Ultramarathon OkumusashiJapan*Yokohama City, Pref. ...
75km6:57:58 h10.76625/668
2008-04-06
Tsurunuma 52 kmJapan横浜鶴見RC
52km4:12:21 h12.3647/78
2009-04-05
Tsurunuma 52 kmJapan*Kanagawa
52km4:21:25 h11.9359/81
2009-08-30
Tsurunuma 52 kmJapan*Kanagawa
52km4:00:10 h12.9914/152
2010-04-04
Tsurunuma 52 kmJapan*Kanagawa
52km4:04:06 h12.7828/86
2010-06-27
Lake Saroma 100 Km UltramarathonJapanIAU Bronze*Kanagawa Pref.
100km9:04:52 h11.01289/1606
2010-08-29
Tsurunuma 52 kmJapan*Kanagawa
52km4:40:00 h11.1437/108
2011-07-17
Tsurunuma 52 kmJapan*Kanagawa
52km4:54:46 h10.5853/24
2011-09-18
Karisakatoge beyond Chichibu RunJapan横浜鶴見rc
143km21:09:43 h6.75728/122
2012-05-02250km45:55:40 h5.443124/220
2012-09-16
Karisakatoge beyond Chichibu RunJapan横浜鶴見rc
143km22:23:31 h6.38661/155
2013-09-08
Tsurunuma 52 kmJapan横浜鶴見RC
52km4:41:34 h11.08120/162
2014-06-08100km11:13:17 h8.912211/1047
2015-06-07100km10:22:59 h9.63188/1240
2015-10-3171.5km15:35:19 h4.5871023/2045
2016-09-11100km10:15:57 h9.74121/214
2016-11-04103km13:30:05 h7.62933/268
2017-11-03105km14:50:08 h7.07846/191
2018-05-04173km25:13:32 h6.8586/117
2018-10-21100km10:12:38 h9.794171/1354
2018-11-02105km14:11:17 h7.40158/270
2019-10-20100km11:19:14 h8.833282/1282
2019-11-01
Tachibana Bay Coast 273 Ultra MarathonJapan歩いて行こう岡山 ももルル
276km2d 01:24:16 h5.58712/51
2022-05-0480km10:35:33 h7.55339/88
2022-05-28103km12:56:47 h7.95652/199
2023-05-03217km33:25:27 h6.49212/30
2023-11-03320km2d 08:59:39 h5.6159/24
2025-05-25100km11:13:07 h8.914109/420
2026-04-19100km10:24:51 h9.60224/267